Personal Information

        Zhengwen He is a professor at the Industrial Engineering Department of Management School, Xi’an Jiaotong University, and a member of the Scheduling Committee of ORSC (the Operations Research Society of China). His educational experiences are as follows.

    Received Bachelor's Degree from the Mechanical Engineering Department of Xi’an Jiaotong University in 1989.
    Received Master's Degree from the Mechanical Instrumental Engineering School of Xi'an University of Technology in 2001.
    Received Doctor's Degree from the Management School of Xi’an Jiaotong University in 2004.
     His research areas are project scheduling optimization. He has completed 21 research projects as a leader, including
    the project “Big data based project agile scheduling optimization for advanced equipment manufacturing under complex and dynamic environment” funded by the National Natural Science Foundation of China under contract No.71871176,
    the project “Research on scheduling optimization of large and complex construction projects with cash flow dynamic balance objective under risk environment” funded by the National Natural Science Foundation of China under contract No. 71371150, and
    the project “Study on optimization of proactive / reactive scheduling for emergency response” funded by the National Natural Science Foundation of China under contract No. 70971105.
     He has published 91 papers, some of them being published in the international top journals:
    Zhiqiang Ma, Zhengwen He, Nengmin Wang*, Zhen Yang, Erik Demeulemeester. A genetic algorithm for the proactive resource-constrained project scheduling problem with activity splitting. IEEE Transactions on Engineering Management, 2018, 99: 1−16.
    Weibo Zheng, Zhengwen He, Nengmin Wang, Tao Jia. Proactive and reactive resource-constrained Max-NPV project scheduling with random activity duration. Journal of the Operational Research Society, 2018, 69(1): 115126.
    Yanting Wang, Zhengwen He, Louis-Phillipe Kerkhove, Mario Vanhoucke. On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem. Computers & Industrial Engineering, 2017, 114: 223-234.
    Zhengwen He, Hua He, Renjing Liu, Nengmin Wang. Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap. Computers & Operation Research, February 2017, 78: 564577. 
    Zhengwen He, Nengmin Wang, Pengxiang Li. Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective. Annals of Operations Research, 2014, 213(1): 203−220.
    Zhengwen He, Renjing Liu, Tao Jia. Metaheuristics for multi-mode capital-constrained project payment scheduling. European Journal of Operations Research, 2012, 223(3): 605−613.
    Zhengwen He, Nengmin Wang, Tao Jia, Yu Xu. Simulated annealing and tabu search for multi-mode project payment scheduling. European Journal of Operational Research, 2009, 198(3): 688–696.
    Zhengwen He, Yu Xu. Multi-mode project payment scheduling problems with bonus-penalty structure. European Journal of Operational Research, 2008, 189(3): 1191–1207.
     Most of his other papers are published in the important journals identified by the National Natural Science Foundation of China.

 

Scenery of XJTU